Gate Oriented Algorithms (B.Chen ‘98)
Goals are for execution time to be linear with number of gates, will optimize all paths at the same (minimize delay of all paths).Netlist preparation: Levelize the network
Level 1
Level 2
Level 3
Previous slide
Next slide
Back to first slide
View graphic version